Bob's colorful yoke sweater is finished. It is Lent, so I can't say alleluia. Now, I must pack it up and send it off.
It is Lent, so I am kntting two hats for the Seaman's Institute of New York and New Jersey. The Institute's Christmas at Sea program recently sent me two skeins of yarn to knit the hats with. I have the proper sized needles for the projects
My cousin's sweater is coming along. Two rows a day. The bobbins still get tangly. I measured my cousin's chest, so that I am assured that the sweater, as knitted as per the pattern, will fit him. No need to make size adjustments.
The brim of the 2008 birthday hat is requiring some size adjustments. The gauge is slightly, only slightly, off. If I cast on 122 stitches, the brim is 25 inches and stretches to 31 inches. If I cast on 110 stitches the brim is 22 1/2 inches and stretches to 28 inches. Now I am trying and casting on 89 stitches to see what the result will be.
I have not yet begun to work on the second of the socks with the heart motif.